Busy, Busy, Busy

 Doing a lot of sewing, but a number of projects cannot be shown before Christmas! Winking smile

But I have also been sewing some Quilt Tops for someone else.  I’m just making the Tops – She will have them quilted by a Long-arm quilter. These are quilts I can share with you.

First one is called “Topsy Turvy” and is made with 3 – 1-yard cuts.  The finished size is about 46” x 53”.  I started it on 12/11 and finished the last couple of borders on 12/13.  I was working on other projects, too.  It was a nice pattern to follow and stitched up fairly quickly.  If you wanted it to be a bigger quilt, you could buy 2 yards of each of the three fabrics.

The Second Quilt Top is called “Fat Quarter 4-Patch” and is made with a total of 3 yards of fabric using 12 Fat Quarters (a Fat Quarter is 1/4 of a yard of fabric, but is cut 18” x 22” instead of 9.5” x 44”). I actually made this one first and it took a few more days to make.  It could be made larger by adding borders to it. It is approximately 42” x 58”

In addition to these two tops I have completed 6 “blank,” and 2 “bleep,” and 1 “Sh!!!”  I have also been working on quilting 1 “not-telling,” and a pillow-cased child’s quilt for the son of one of Kim’s friend.  Pictures at a later date! Don't tell anyone smile

Posted in Hobbies, Quilting, Quilts | Leave a comment

Day #4–Quilt Getaway

OK, technically, it’s been my 3rd full day.  I’ve packed my machine and most of my supplies up and getting ready to head home in the morning.

Today has been productive, just don’t have a lot to show for it.  That’s why I like having some small projects available so I can feel that I’ve gotten something completed.

This morning started with Ironing, Followed by sewing the rows together for the quilt top I started yesterday.  And MORE IRONING!

 Ta Da!  it is sort-a finished!

I still need to add two borders, piece the backing, add the batting, quilt & bind. 

Ok, I guess it is still far from being completed, but it makes me feel better to think of it as almost finished.

 

After lunch I started Quilt Top #2 – Same pattern, different fabric.  Stitched Small Strip to Larger Strip (28 Strip Sets), Iron, Trim, Sub-cut into 14 piles of 10 blocks each – that’s 140 blocks!  Boy, I guess I have been busy!  (The quilt top only uses 126 total blocks, so I’ll have a few left over.)

I’m pleased with what I’ve gotten done.

Taking a break this afternoon – view from my room.  After two days of clouds and/or rain it was sunny today.

                    

Posted in Quilting, Sewing | Leave a comment

Day #3–Sew Get Away

After breakfast and DH left to teach his class, I got back to work.  First thing on the agenda was to finish up the Advent Calendar.  It needed the hanging sleeve stitched on and two more rows of quilting on the border.  I need to add a label and it will be completed.  Now the question is – what do you put into the 24 pockets to help count down the days to Christmas?

Next project on my agenda – Piece a Quilt Top. I am using a 5-yard Bundle Quilt Kit from Fabric Café. Check them out – nice fabric, good prices, great people!  The 3-Yard Bundles & 5-Yard Bundles take the worry out of picking the fabric individually and come with a free pattern! See the one I’m working on – 5-Yard Bundle from Fabric Cafe.  Hint, Hint:  Sign up for their newsletter and receive codes for discount pricing.

I wanted to have this top completely pieced by tonight.  I have already cut the first step – Small Strip A & Larger Strip B of paired light & dark fabric.

Next Step – Strip Piece Small Strip A (Light or Dark) to paired Larger Strip B (Dark or Light). Then iron these pieces open – I like to press the seams toward the dark fabric because it helps me match points.  But in this case it doesn’t matter as these seams will not have to align with any other seams.

More Cutting…More Strip Piecing…

Finally I got the 18 blocked pieced into 7 rows.  Time for bed.  Ironing will have to wait until the morning.

Posted in Quilting, Quilts | Leave a comment

Day #2–Quilt Getaway

Sew Day #2 – Raining outside, Sew a good day to Sew!

Cut Batting for Cloth Puzzle – Those 42 Half-Square Triangles.  I don’t have enough batting, will have to go back to my stash of odds & ends of leftover batting.

Trim Half-Square Triangles – those nasty little ‘dog-ears.’ I’ve paired HST & Plain Squares, and added the batting that I had cut.

IMG_0429

Then I finished sewing the pockets on the Advent Calendar.  I had already stitched 19 pockets, but had 5 more to go.

Iron Top & Backing for Advent Calendar, Assemble Batting, Backing & Top Pillowcase Style – Stitch, Turn, Trim, Iron.  There is a lot of ironing to quilting.  Some people skip this step, but I find it really helps to keep the seams neat.

Quilt-As-Desired – Now that is a peculiar phrase.  I often spend a lot of time just imagining different scenarios of how to quilt a project. Sometimes I just do simple, straight lines.  But with the Advent Calendar, there are pockets, so I couldn’t just stitch across.  I decided to do Outline Quilting of the Train Cars – doesn’t go fast with all the twist & turns.

Next challenge – as this is not a bed quilt, it needs a means of hanging it.  So I made a small hanging sleeve for the back. I’m thinking of inserting a dowel rod and using those Command Removable Hooks.

I still have to stitch the hanging sleeve onto the back & I may add two more quilting lines around the outside border.  Think I’ll go to bed earlier tonight and get a fresh start in the AM.

IMG_0432

Posted in Quilting, Sewing | Leave a comment

Day #1–Quilt Getaway

Sew many projects, Sew little time.  Sew, I’ve set aside 3-1/2 days to Sew.  No interruptions, except maybe some computer/blog time.

Sew, Day #1 – actually it was mostly Evening, Day #1 – not a full day.  Of course set-up was necessary. Prioritizing Projects, important.  Just sitting down, sewing and completing something.

Don’t know about you, but some of my motivation comes from just sitting at the machine and sewing.  There is just something about actually getting into sewing that seems to help with my momentum.

Sew, I sewed.  Count them – 42 half-square triangles

2011-11-16 01.05.43

& a mini-10-minute table runner.

2011-11-16 01.06.51

(I may do some quilting on the Table Runner, but it looks completed Smile )

Went to bed about 1:30 am.  More Sewing tomorrow.

Posted in Hobbies, Quilting, Sewing | Leave a comment